Meter Loop Construction<br />
Meter Loop
Meter Complete 9-9-2023

As of today, August 21, the power company meter loop is ready to go.  All approvals, inspections and easments have been completed and we are on the schedule to have power installed in 3-4 weeks.

The process started Tuesday, August 8th, when I met with a Hilco Coop representative and we agreed where the meter loop was to be placed.  From there all supplies were acquired and assembled.  By Friday August 18th all the hardware was ready to go along with all permit, inspection and easement documentation.

On 9-13-2023 we got a call from the power company to get the gate codes so they could connect our power.  They said they would be done the same day.